Our Electric Building Headquarters Project
As part of a series of initiatives to promote solar energy in the community, the PUD has installed a photovoltaic systems at its Everett headquarters. The 10-kilowatt system can produce nearly enough energy for an average PUD customer’s home.
A total of 54 photovoltaic modules are installed on the south side entryway and adjacent rooftop at the PUD office building. The system includes a display in the PUD’s lobby that provides visitors with real-time output for the solar panels.
System Specs:
- 54-module system
- Expected production of 10,700 kilowatt-hours annually
- Utilizes Fronius inverter to convert DC/AC power
- Lobby display features output
- Design, installation and commissioning by Whidbey Sun & Wind